“15kva Hybrid inverter with 24 tubular batteries” has been added to your cart. View cart
2.5KVA Inverter Solution Installation
1 × ₦1,610,000.00
5KVA/48V Inverter 4 X 12V 220AH Battery grid-tie Complete Installation
1 × ₦5,000,000.00
4KVA Inverter 4 X 12V 200AH Battery grid-tie Complete Installation
1 × ₦3,600,000.00
15kva Hybrid inverter with 24 tubular batteries
2 × ₦15,000,000.00
12V 200AH PRAG Tubular Flooded Battery
1 × ₦338,700.00 Subtotal: ₦40,548,700.00
Select at least 2 products
to compare
